精品国产免费久久久久久,99视频九九精品视频在线观看,免费的视频网站入口,久久国内,福利视频亚洲,h小视频在线观看网

Scan code consultation:
0755-2102 2109
Service
Current location: Home Service MA and KA Certificate
Guidelines for Applying for Changes in the Mark of Coal Safety MA and Coal Safety KA

SINO Testing Services

| 2020-06-22|Return

If the products of the enterprise are within the validity period of the safety mark, but there are changes in the business registration information, production conditions, or product technical documents of the certificate holder, they need to apply to the national agency for a change in the safety mark.






1、 Apply

If the product of the certificate holder needs to be changed within the validity period of the safety mark, an application for change shall be submitted to Zhongnuo Testing. The change content includes changes in the legal representative, residence, registered capital, technical personnel, inspection personnel, production equipment, inspection equipment, and product technical documents of the certificate holder.

2、 Initial review/acceptance

Zhongnuo Testing conducts preliminary review of application materials and accepts those that meet the requirements.

3、 Change assessment

(1) For changes in the business registration information of the holder, those that meet the requirements after review shall be recorded; For those that require further verification through on-site evaluation, after confirming that the changes comply with the relevant management regulations for safety signs, a safety sign certificate will be issued.

(2) If there are changes to the product technical documents, national institutions shall organize the review and evaluation of the changed content, and determine the audit process that should be carried out for the changed product.

4、 Technical review

For those that require technical review, it shall be conducted in accordance with the requirements of the technical review procedure, and the content of the technical review shall generally only focus on the changed parts.

5、 On site evaluation

For those that require on-site evaluation, follow the requirements of the on-site evaluation procedure.

6、 Product Inspection

For those that require inspection, follow the inspection procedure requirements, and the inspection items should only involve the changed parts in principle.

7、 Final review, replacement of safety sign certificate

Zhongnuo Testing will submit relevant reports to national institutions. After receiving the relevant reports, the national institutions will conduct a final review of the changed products. Qualified products will be re filed with technical documents or replaced with safety mark certificates. When replacing the certificates, the certificate number and validity period will remain unchanged.

8、 Choosing Zhongnuo Testing, we can provide the following services:

(1) Develop a work plan based on the actual production, technology, and product situation of the enterprise, and carry out and complete the overall work from product application to certification according to the plan;

(2) Provide institutional certification model references and make suggestions;

(3) The enterprise shall provide corresponding technical materials for application, such as drawings, manuals, and details of supporting parts; We can provide a reference template (for first-time applications);

(4) Collecting, organizing, and submitting application materials, with a one-time qualification;

(5) Provide process information templates such as production process flow diagrams, process cards, assembly cards, and product information templates that meet the requirements of the organization (for first-time applications);

(6) Provide product inspection procedure templates and guide enterprises in preparing factory inspection reports that meet standards;

(7) Maintain communication with the laboratory to ensure timely arrangement of on-site product inspection time and cooperate with the company to complete technical data rectification;

(8) Communicate with national institutions on specific matters such as the time and project of on-site evaluation;

(9) Establish a system document that meets the requirements of the "Guidelines for On site Review of Safety Signs"; Such as coal mine safety requirements, safety standards and quality manuals, procedural documents, management systems, equipment operation procedures, inspection procedures, training plans, test papers, production records, inspection records, maintenance records, and other materials;

(10) On site production guidance, training, review and communication of response skills; On site pre evaluation and improvement of evaluation content;

(11) Review to ensure approval (hardware must meet requirements);

(12) Collaborative enterprise rectification

(13) Assist in evidence collection


 



Related Recommendations
Contact us
0755-2102 2109
Add: 13F, Building C, Kangjia Guangming Technology Center, No. 288 Xingxin Road, Guangming District, Shenzhen
Follow us
Copyright: Shenzhen Zhongnuo Testing Technology Co., Ltd. 粵ICP備18004888號
Service Hotline
18924609560
點擊這里給我發消息 1354407946
點擊這里給我發消息 1354407946
主站蜘蛛池模板: 欧美高清视频在线 | 精品成人毛片一区二区视 | 深爱激情五月婷婷 | 国产在线成人精品 | 久久久久综合中文字幕 | 九七97影院理论片手机在线观看 | 成人国产亚洲欧美成人综合网 | 五月激情六月 | 97精品在线观看 | 国产成人精品综合在线观看 | 成人综合婷婷国产精品久久免费 | 夜夜躁日日躁狠狠久久 | 97免费在线视频 | 99久久精品免费观看国产 | 久久精品99精品免费观看 | 日本高清精品 | 99在线视频免费 | 啊v天堂在线 | 不卡一区二区在线 | 国产亚洲一级精品久久 | 天堂av2017男人的天堂 | 精品伊人久久久久7777人 | 热久久免费视频 | 我爱52av好色| 黄色小视频免费在线观看 | 我和岳交换夫妇中文字幕在线 | 大色虫成人午夜在线观看 | 久久久久久久网 | 国产日韩欧美在线观看 | 五月婷婷六月丁香综合 | 亚洲国产成人精品区 | 高清亚洲综合色成在线播放放 | 久久成人免费播放网站 | 狠狠干五月天 | 国产高清好大好夹受不了了 | 久久综合给合久久狠狠狠色97 | 色即是空电影在线 | 精品女同一区二区三区免费站 | 一级一级一级毛片免费毛片 | 久久久久亚洲 | 激情4p |